Surveys completed
Homeowners, Brenda & Todd, break ground on their future home.
Footings dug
Pouring footings
Concrete block for stem wall delivered
Stem wall construction nears completion
Fill dirt brought in
Plumbing rough-in
HVAC rough-in
Electical rough-in
Temporary power turned on
Interior footings dug
Compaction test
Slab preparation for concrete
built wall to allow Bobcat to drive over stem wall
Bobcat crosses the bridge
compacting fill dirt with vibrating roller
wall removed, stem wall intact
slab prepped for concrete
concrete slab poured
concrete finishers working on slab
framing begins
first wall up
trusses delivered
1st floor walls framed
floor trusses installed
exterior walls & 2nd floor sheathing begins
2nd floor framing begins
Brenda visits 2nd floor for the 1st time
framers set garage trusses
Todd & Brenda in the cold (& wet) dining room
crane lifts roof trusses to 2nd floor
another view
roof sheathing continues
George sheathing the roof in front of house
Ralph sheaths the garage roof
porch & gable front still missing
front porch framing begins