future site of the "Alachua"
lot clearing
lot cleared and boundaries staked
batter boards & strings
digging the footers
pouring concrete footers
laying block for stem walls
fill dirt
foundation preparation
slab prepped for electrical, hvac, and plumbing stub-ins
plumbing & electrical lines installed
compacting the slab
vapor barrier complete - ready for concrete
pouring the slab
truss & floor joist delivery
completed slab
framing begins
first floor joists installed
second floor begins
2nd floor interior walls erected
crane lifts roof trusses into place
rear/side view
wall sheathing continues
roof & wall sheathing complete
HVAC (heating & air) ducting installed
HVAC, electrical, & plumbing continues...
roof dryed-in w/ felt paper
windows and guest tub delivered
electrical rough-in complete
kitchen counter for bar stools
kitchen island & pantry
family room (view from dining room)
structured wiring (telephone, network, distributed audio/video, & security) continues...
Lenny framing the decorative niche
master bedroom (view from balcony)
master bath w/ pocket door (view from master bedroom)
2 person master shower w/ bench & master toilet
upstairs hallway
bedroom #2 (view from bedroom #3)
bedroom #3 (view from bedroom #2)
understairs storage closet, stairway, & family room (view from pantry)
family room & kitchen island (view from pantry)
kitchen counter, dining room, side porch, & 2 car garage (view from pantry)
wrapping the house with vapor barrier
house wrap complete
view from opposite side
window installation
window installation continues
gas lines installed
master bath shower valves installed
Guest bath tub & shower valve installed
laundry hook-ups installed
hot water heater installed
carpenter Noel O'Keeffe creates custom trim surround for oval window
hardiboard siding progresses
porch columns & balcony trim complete
hardiboard siding complete, lot graded
archway & decorative niche framing complete
ceilings prepped for sound proofing
low-voltage structured wiring console
blown cellulose insulation begins
master bedroom ceiling plaster board
downstairs archway & decorative niche
plasterboard almost complete
plaster continues
archway & decorative niche plaster
archway
master bedroom ceiling plastered
upstairs hallway
downstairs plaster complete
front & side sidewalk concrete poured, awaiting bricks
rear driveway concrete poured
interior trim begins
crown in master bedroom ceiling
exterior painting begins
exterior painting complete
interior paint priming
interior paint (kitchen in green)
living room paint continues
view of archway & decorative niche (trim paint not yet complete)
designer, Julie Sprague, examines upstairs guest bathroom
master bedroom ceiling trim paint complete, awaiting rope lighting
soffits installed
completed photos are
here
Stop
Pause
Back One Image
Show Description
delay:
1 seconds
3 seconds
5 seconds
10 seconds
15 seconds
20 seconds
direction:
forward
reverse
random
size:
320x320
640x640
800x800
1024x1024
1280x1280
no limit
© 2010 J and M Contractors - All rights reserved.
State of Florida licensed Certified General Contractors, CGC023743, CGC1515352